色婷婷久久,国产中年熟女高潮大集合,欧洲Av无码放荡人妇网站,九色porny

當(dāng)前位置:首頁-新聞資訊

鋁卷生產(chǎn)廠家:涂層鋁卷生產(chǎn)工藝的5個(gè)步驟詳解

來源:http://www.texjob.com.cn/ 發(fā)布時(shí)間:2024-09-02

  涂層工藝是彩色鋁卷生產(chǎn)中較為關(guān)鍵的步驟,直接影響較終的涂層質(zhì)量和產(chǎn)品的耐用性。

  The coating process is a crucial step in the production of colored aluminum coils, which directly affects the final coating quality and product durability.

1545991894924063.jpg

  因此,涂層工藝十分嚴(yán)格。隨著涂層設(shè)備的不斷完善,新型涂料的開發(fā)利用,使得涂層鋁卷的生產(chǎn)更加成熟,加工費(fèi)也在下降。涂層鋁卷因此獲得了迅速的發(fā)展。

  Therefore, the coating process is very strict. With the continuous improvement of coating equipment and the development and utilization of new coatings, the production of coated aluminum coils has become more mature, and processing costs are also decreasing. Coated aluminum coils have therefore experienced rapid development.

  那么涂層鋁卷的具體工藝是怎樣的呢 一般帶卷涂層的生產(chǎn)工藝有5個(gè)步驟,即帶卷輸入、清洗與化學(xué)處理、涂漆、固化和成品輸出。不同情況的工藝布置和設(shè)備組成有所差別,但基本部分是相同的。

  So what is the specific process of coating aluminum coils? Generally, the production process of coil coating has 5 steps, namely coil input, cleaning and chemical treatment, painting, curing, and finished product output. The process layout and equipment composition may vary in different situations, but the basic parts are the same.

  一、原料卷輸入,是開卷機(jī)連續(xù)開卷保證帶卷連續(xù)穩(wěn)定輸入生產(chǎn)線,有的采取十字轉(zhuǎn)動梁式載卷機(jī),也有采取雙臺前后設(shè)置交替開卷機(jī),總之是為了及時(shí)供卷;

  1、 Raw material roll input refers to the continuous unwinding of the coil by the unwinding machine to ensure the continuous and stable input of the coil into the production line. Some adopt a cross rotating beam type winding machine, while others adopt a dual front and rear alternating unwinding machine, in order to supply the coil in a timely manner;

  二、表面清洗和化學(xué)處理,是使鋁卷上下表面必須清洗干凈,進(jìn)行化學(xué)預(yù)處理,為了保證油漆能夠牢固附著;

  2、 Surface cleaning and chemical treatment are necessary to clean the upper and lower surfaces of the aluminum coil and perform chemical pretreatment to ensure that the paint can adhere firmly;

  三、是涂漆,一條生產(chǎn)線至少有兩個(gè)以上輥涂機(jī),保證面漆和底漆兩層涂色;

  3、 It is painting, and a production line should have at least two or more roller coating machines to ensure that the topcoat and primer are painted in two layers;

  四、是漆層固化,指的是剛進(jìn)行涂漆的帶卷要在接觸下一個(gè)輥面之前完成固話,避免互相粘連和破壞,一般來講,至少包含兩個(gè)固化箱;

  4、 It refers to the curing of the paint layer, which means that the tape roll that has just been painted should be fixed before contacting the next roller surface to avoid mutual adhesion and damage. Generally speaking, it includes at least two curing boxes;

  五、是成品輸出,保證生產(chǎn)線速度與成品卷轉(zhuǎn)移同步。

  5、 It is the output of finished products, ensuring that the production line speed is synchronized with the transfer of finished rolls.

本文由鋁卷生產(chǎn)廠家友情奉獻(xiàn).更多有關(guān)的知識請點(diǎn)擊:http://www.texjob.com.cn/真誠的態(tài)度.為您提供為的服務(wù).更多有關(guān)的知識我們將會陸續(xù)向大家奉獻(xiàn).敬請期待.

This article is a friendly contribution from an aluminum coil manufacturer. For more related knowledge, please click: http://www.texjob.com.cn/ Sincere attitude. We provide you with excellent service. We will gradually contribute more knowledge to you. Please stay tuned